Skip to content
TÜBİTAK

The power electronics line item in a TÜBİTAK-supported project.

Student research programmes such as 2209-A and 2209-B support machinery, equipment and consumables costs. Building your project's power stage from a ready, documented board both makes the budget line concrete and frees your research time for the actual problem.

About the organisation

TÜBİTAK — the Scientific and Technological Research Council of Türkiye — supports university students' research projects through a number of programmes. The most widely used are the 2209-A and 2209-B support programmes run by the Directorate of Science Fellowships and Grant Programmes (BİDEB), and the 2242 University Students Research Project Competitions.

Under 2209-A, machinery and equipment, consumables, travel and service procurement costs are supported for research projects prepared by undergraduate students; calls open twice a year and projects run for at most 12 months. In a project involving high-current power electronics the hardware line is a significant part of that budget, which is why a clear specification list and quote at application time makes your work easier.

Baetronics is not an official partner, sponsor or authorised representative of this organisation. This page exists to describe the power electronics needs of teams taking part.

Project subjects where this helps

Elektrikli tahrik sistemleri

On a project about motor characterisation, driver algorithm development or efficiency measurement, designing the power stage from scratch eats most of the research time. Starting from a ready, measured driver keeps the project on the actual research question.

Boards that fit

İnsansız sistemler

Whether the platform is aerial, ground or underwater, you cannot get to flight or sea trials without a sound distribution stage feeding several consumers from one battery.

Enerji verimliliği çalışmaları

In a project measuring losses, the system being measured has to behave repeatably itself. Thermally sized power planes reduce the heat-driven drift in the measurement.

For the application and the project

A specification list you can attach

We share specifications written in measurable values that you can put straight into the hardware section of your proposal.

A quote for the budget line

We provide a written quote for the requested configuration so you can show it in the budget table.

Measurement output

We share the output of the supply, output and communication checks made before delivery on request — you can use it in your project report.

Delivery that fits the project calendar

Projects run for at most 12 months. Tell us when the hardware has to be in your hands and we will plan around it.

Questions teams ask

Can you provide a proforma invoice for the application?
We prepare a written quote for the requested configuration so you can document the budget line. Tell us which document type you need and we will issue it accordingly.
Do I have to order before the project is approved?
No. At application stage what you need is the specification and the price; we share both with no obligation to order. The order is discussed once the project is approved.

Tell us what your team needs.

Send your category, battery voltage and calendar. We will say from the start what can be made in time.